Sneak Peek of Projects Preparing to Bid Soon

Sneak Peek of Other Construction Projects Preparing to Bid Soon . . .

Allerton Apartments Abatement and Demolition, Phase 2: Units A, B, C and D
Design and bid documents are being prepared by The Osborn Engineering Company for the abatement and demolition of the remaining Allerton Apartment Units A, B, C and D. Corresponding studies are being produced to show this green space being utilized as athletic fields. This project is anticipated to be advertised for bidding in late spring 2015. Demolition will begin late summer 2015 after leases expire. This General Contracting project is being managed via OAKS-CI.

East Campus Chilled Water Plant New Chiller and New Chiller Plate and Frame
This project, designed by Scheeser Buckley Mayfield, adds a new chiller and cooling tower to the existing East Campus Chilled Water Plant facility. As more residence halls have been upgraded to have air conditioning, the demands on the existing infrastructure have increased. This new equipment allows for system growth and redundancy while providing energy savings and peak performance. Design work is underway. Construction will proceed in phases so as to not interrupt any chilled water service to the residence halls. This General Contracting project is being managed via OAKS-CI.

Geauga Classroom Building HVAC Replacements, Multiple Phases
In 2010, Kent State University at Geauga commissioned a study to evaluate the Classroom Building's heating, ventilation and air conditioning systems to determine and recommend which HVAC equipment and systems are most in need of replacement and to recommend a system type for replacement. Karpinski Engineering, Inc. designed the multiple phases of this project. Pending the approval and release of state funding, design of the final Phase 4 commenced during the winter. Phase 4 work is anticipated to be bid in early spring in order for construction to commence during the spring of 2015. This General Contracting project is being managed via OAKS-CI.

Nixson Hall Kitchen Renovation
Kitchen equipment in Nixson Hall's Food Lab is original to the building, circa 1965, and is showing its age. This project will provide new finishes, new cabinets, ceilings and MEP systems in the kitchen space. Currently, this project is under design by David Ports Architect, Inc. This General Contracting project is being managed via OAKS-CI.

Tuscarawas University Hall and Attention Center Demolition
Kent State University at Tuscarawas’ University Hall and the Attention Center will be abated and then demolished. Asbestos abatement analyses were conducted and construction documents are being prepared for the abatement and demolition of both buildings. This General Contracting project is being managed via OAKS-CI.

White Hall Restroom Renovation
White Hall's restrooms are original to the building, circa 1966, and do not currently meet ADA guidelines; finishes and fixtures are worn. This project will provide new finishes, and upgrade HVAC, electrical and plumbing systems for code compliance and to meet ADA requirements in White Hall's existing restrooms. Currently, this project is under design by Vocon Design, Inc. This General Contracting project is being managed via OAKS-CI.